Planning and Scheduling
Performance-driven companies have mastered the art of predicting and responding quickly to changes in customer demand with minimal business interruption. Whether you are a global, multisite enterprise or a single site manufacturer or distributor, precise and flexible planning and scheduling is imperative to efficient and profitable operation. Epicor offers a comprehensive solution for forecasting, material requirements planning (MRP), scheduling, and advanced planning and scheduling to meet the needs of today’s agile businesses
Forecasting and Master Production Scheduling
Forecasting and Master Production Scheduling (MPS) in Epicor are included with the Material Requirements Planning module and are designed to assist manufacturers and distributors with both day-to-day control and long-range planning and decision making. Forecasting and MPS support businesses that operate multiple, mixed-mode strategies simultaneously. Forecasting & Master Production Scheduling functionality includes:
Forecasting
Forecast Buckets
Forecast Analysis
Inter-Company Trading
Master Production Schedule
Driving Capacity and Raw Material Procurement
Epicor Smart Demand Planner
Epicor Smart Demand Planner provides cloud-based statistical forecasting that automatically selects the right forecast model for each item—accounting for trend, seasonality, and promotion/event-driven demand. For companies that manage many items like component parts, service parts, material requirements planning, or high-tech equipment, it includes an intermittent demand model so you can accurately forecast the inventory needed to hit desired service levels
Material Requirements Planning
Built for the needs of a single site as an well as extended enterprise, MRP offers cross-plant and cross-company planning. Enhanced to offer plant source as well as product group sourcing of materials and assemblies, MRP automatically and visually extends the enterprise to efficiently manage supply and demand, from forecasting and MPS to MRP generation, and more. Material Requirements Planning functionality includes:
MRP Generation
Material Planning
Planning Contracts
Dynamic Lead-Times
Part Planning Tools
Plan as Assembly
Planning Horizon
Auto Job Firm Process
Multisite
Multilevel Pegging
Sourcing By Plant
Available-to-Promise
Planning Types
Rough Cut Horizon
Recycle Jobs
Short Horizon Days of Supply
Calculate Manufacturing Lead Time
Start Minimum Quantity
Bill of Materials Check
Scheduling and Resource Management
Multiple resource views and online scheduling tools such as the change impact informer offer the master scheduler and manager the ability to visually locate overload problems and slack conditions, then perform cost and throughput analysis on schedule changes before they are firmly committed. Scheduling & Resource Management functionality includes:
Production Scheduling Board
Alerts
Finite Scheduling
Drag-and-Drop
Operation Complete Quantity and Complete Time Displayed
Overload Informer
Multilevel Assemblies
Schedule Multi-Job
What-If and Change Impact
Setup Grouping
Capabilities with Zero Priority
Dual Resource Constraints
Conditional Forward Schedule
Resource Group
Finite Load Horizon
Resource-Based Schedule
Reschedule Delta
Rough Cut Scheduling
Scheduling Factor Send Ahead
Scheduling Blocks
Material Constraints Displayed
Advanced Planning and Scheduling
Available as an extension to Scheduling, Epicor Advanced Planning and Scheduling incorporates the strength of the Scheduling engine and enhances it with advanced functionality such as multiple constraint scheduling, a wide range of scheduling methods, visual drag-and-drop scheduling, capability and dependent capability-based scheduling, real-time capable-to-promise functionality, and advanced material planning functionality.
Capable-to-Promise
Multiple Resource Scheduling Board
Multiple Constraints
Resource Eligibility
Automated Scheduling by Capability
Dependent Capabilities
Finite or Infinite Capacity
Minimum WIP Scheduling
Dimensional Planning
Rate-Based Scheduling
Material Constraints
Advanced Material Planning
Change Impact Analysis
Time Adjustment
Optimization Rules
Balanced Optimization
Single Cell Scheduling
Unlimited What-If
Multi-Plant Communication
Multisite Management
Not only are manufacturers and distributors looking for new tools to oversee multiplant operations, but they’re also looking to maximize the use of existing resources. Alternative production methods management helps optimize the production processes for specific parts in each plant, based on the resources available. Another optimization tool includes the transfer of material or semi-finished components to another plant for completion.
Comments